Cooling Tower Maintenance and Water Treatment Service Log 2018
This document is a detailed service and maintenance log for a cooling tower system at an Epstein property, documenting monthly water treatment, legionella testing, and cleaning services performed throughout 2018. The log tracks multiple service visits by Marewin Delta Crud/Marewin Dela Crud, including water treatment maintenance, legionella inspections, and tower cleaning operations, with specific dates and PSI readings recorded for each service.
Document Transcript
SERVICE LOG - COOLING TOWER MAINTENANCE AND WATER TREATMENT
This document appears to be a photographic record of a maintenance service log table. The table contains the following columns: Job Code, Client Name, Job Type, Service Description, Special Instructions, and Start Date.
Key Service Entries (2018):
5135 - Water Treatment, Cooling Tower - Monthly Maintenance - Multiple entries throughout 2018 (April, May, July, August, October, December) - Services include water treatment on cooling tower with PSI readings and water level measurements - Entries reference inclusion of PSI data with water tests and readings
5136 - Tower Cleaning & Disinfection - Cooling Tower - Dates: 25-Apr-2018, 07-May-2018, 22-Oct-2018 - Services include clearing and disinfection of cooling tower
5135.1 - Legionella Test, Cooling Tower - Dates: 23-May-2018, 11-Jun-2018, 10-Sep-2018 - Includes 90-day tower inspection and legionella testing
4869.1 - Legionella Test, Cooling Tower - Date: 23-May-2018 - 90-day tower inspection and legionella test
5137 - Inspection, Annual Cooling Tower - Inspection - Date: 12-Nov-2018
5135.7 - Water Treatment, Cooling Tower - Monthly Maintenance - Date: 15-Nov-2018
The log shows systematic maintenance with monthly intervals for water treatment and periodic legionella testing (90-day intervals) as required for cooling tower safety compliance.
Names mentioned: - Marewin Delta Crud / Marewin Dela Crud — Service provider performing water treatment, cleaning, and legionella testing on cooling tower
Mentioned Entities
Frequently Asked Questions
What is "Cooling Tower Maintenance and Water Treatment Service Log 2018"?
Where does this document come from?
How long is this document?
Can I download this document?
Type
OtherSource
DOJ - Data Set 1Release Date
January 24, 2025
Pages
1
File Size
452.4 KB
Format
Data Set
data-set-1
OCR Confidence
ID: EFTA00000019
Last updated: May 14, 2026
Explore other documents mentioning people in this file
Related Documents
View all othersArchitectural Sketch of Mountain Landscape with Structures
This is a hand-drawn pencil sketch depicting a mountainous terrain with what appears to be architectural elements or structures in a valley setting...
Employee Emergency Contact Form for Maintenance Staff Member
This is an emergency contact form from LSJE, LLC (a Virgin Islands entity) dated March 19, 2018, for an employee named Oriole Joseph who worked in ...
Floor Plan of Manhattan Residence with Architectural Annotations and Markings
This is an architectural floor plan for a residence located at 9 East 71st Street, New York, NY (3rd Floor), dated 7/6/19, prepared by SA Margaret ...
Unidentified Document - Mostly Blank Page
This page appears to be nearly entirely blank or heavily redacted, with only a faint orange/amber-colored rectangular shape visible at the top of t...
Employee Emergency Contact Form for Cristobal Hidalgo Herrera
This is an employee emergency contact form from LSJE, LLC, a company operating in St. Thomas, U.S. Virgin Islands. The form captures personal infor...
Jeffrey E. Epstein Principle: LSJE Employees and Flight Operations Staff
This document is an organizational chart titled 'Jeffrey E. Epstein Principle' that lists employees across multiple operational areas of LSJE (pres...