Theater 3 Renovation Contractor Proposal and Equipment Specifications

This is a contractor's proposal dated May 19 for demolition and reconstruction of Theater 3, including a new Little St. James Flag Pool Cabana with a shaded roof. The document outlines detailed line-item costs for structural work, materials, and installations, totaling approximately $97,353. It specifies that this is a lump sum contract and requests architectural quality drawings and general conditions as prerequisites.

Share

Document Transcript

CONTRACTOR'S NAMED JOHN BRIDGEMOELLER

Date:31-May-19

Proposal Summary: Proposal received for demolition of existing structures and construction of new Little St. James Flag Pool Cabana with Shaded Roof. The contractor notes there was a serious issue with the timing of taking what appears to be export from the contractor during this project. The list is as follows.

Requirements:

1. Prepare a working drawing (Architectural quality is not necessary)

2. General conditions shall be included as part of the line items (not separately)

3. Proposals shall have a schedule of values based upon activities listed below

Itemized Cost Breakdown: - Demolition of Existing Roof: $2,500.00 - Demolition of Existing Concrete: $600.00 - Demolition of Existing Tile Within Footprint: $2,100.00 - Provide Dumpsters Located at Owner's Direction: $1,800.00 - Barge for Dumpster Hauls Provided by Owner: — - Excavate & Pour 4 New Column Footings: $5,000.00 - Strip & Remove All Formwork: $1,500.00 - Form & Pour Bond Beam (AR, Steel Beam Acceptable): $4,350.00 - Strip & Remove All Formwork: $1,500.00 - Frame Roof with 3/8" rafters & 1"x12" hips 4/12 Pitch: $9,500.00 - Install 2"x12" Fascia Board Around Roof Perimeter: $850.00 - Install One Layer of 1/2" PT Plywood Decking to Rafters: $3,329.00 - Install Ice & Water Shield to Plywood: $1,800.00 - Install Copper Flashing/Drip Edge to Match Existing: $580.00 - Install Concrete Roof Tile: $7,500.00 - Install & Plaster/Drywall Ceiling: $6,500.00 - Plaster All exposed Concrete Columns & Beams: $4,344.00 - Install New Coral Stone Tile Per Owner's Instructions: $4,800.00 - Working drawings: $7,000.00 - Additional item: $3,500.00 - Total: $97,353.00

Contact Information: For questions or additional information, contact Bill Terry at (340) 228-6499. This is noted as a lump sum contract and any changes will need to be signed by the Contractor and Owner.

Signature line shows: AULS

Names mentioned: - John Bridgemoeller — Contractor named in proposal - Bill Terry — Contact person for questions; phone (340) 228-6499

Frequently Asked Questions

What is "Theater 3 Renovation Contractor Proposal and Equipment Specifications"?
This is a contractor's proposal dated May 19 for demolition and reconstruction of Theater 3, including a new Little St. James Flag Pool Cabana with a shaded roof. The document outlines detailed line-item costs for structural work, materials, and installations, totaling approximately $97,353. It specifies that this is a lump sum contract and requests architectural quality drawings and general conditions as prerequisites.
Where does this document come from?
This document was released as part of the DOJ - Data Set 1 collection. All documents in this archive are sourced from publicly available U.S. government releases.
How long is this document?
This document contains 1 page and is available as a PDF file (306.3 KB).
Can I download this document?
Yes, this document is available for download or viewing in its original format. Use the "View Original" or "Download" buttons on this page to access the source file.
Document Details

Release Date

January 24, 2025

Pages

1

File Size

306.3 KB

Format

PDF

Data Set

data-set-1

OCR Confidence

100%

ID: EFTA00001584

Last updated: Mar 28, 2026

Related Documents

View all purchase orders

Keep Exploring